Blog

BLOG

julia
7 months 3 weeks ago

STRENGTH

5 SETS OF

10 BENCH PRESS

DIRECTLY INTO

MAX PUSH UPS*

REST 1:30

START BENCH @ 50% OF MAX

*FROM BENCH TO PUSH UPS THERE SHOULD BE MINIMAL REST

WORKOUT FOR TIME

20 CAL ASSAULT BIKE (NOT AN ERG)

julia
7 months 3 weeks ago

SKILL

ROWING TECHNIQUE

REVIEW - PROPER FORM, DAMPER, SPM, SPLIT TIMES

CONDITIONING

EMOM X 24

1- 6 TNG POWER SNATCH, BUILDING

2- 12 PUSH UPS

3- MAX CAL ROW

4- REST

julia
7 months 3 weeks ago

WORKOUT

WITH A PARTNER

CHAD X1000 FOR TIME

1000 BOX STEP UPS TO A 20"

BOX SPLIT REPS WITH PARTNER

RX IS PERFORMED WEARING A RUCK SCALE BY NOT WEARING ANY WEIGHT/ADJUST HEIGHT OF BOX

julia
7 months 3 weeks ago

STRENGTH

5 SETS OF 3

TEMPO DEADLIFT :03 DESCENT

REST 1:30 AFTER EACH SET

START AT 50% AND BUILD BY FEEL

CONDITIONING

4 ROUNDS FOR QUALITY

1000M BIKE

500M ROW/SKI

julia
7 months 3 weeks ago

STRENGTH

EVERY :90 X 8 SETS

1 SQUAT CLEAN

+ 2 PUSH JERKS

BUILDING WORKOUT WITH PARTNER

FOR TIME 50-40-30*

THRUSTERS

SYNCHRO BURPEES OVER THE BAR #95/65

julia
7 months 3 weeks ago

STRENGTH

MUSCLE SNATCH

5-4-3-2-1 REPS SHOULD BE BUILDING AND REMAIN TNG

WORKOUT

"ISABEL"

30 SNATCHES FOR TIME #135/95

julia
7 months 3 weeks ago

STRENGTH

EVERY :90 X 8 SETS

1 SQUAT CLEAN

+ 2 PUSH JERKS

BUILDING WORKOUT WITH PARTNER

FOR TIME 50-40-30*

THRUSTERS

SYNCHRO BURPEES OVER THE BAR #95/65

julia
7 months 4 weeks ago

STREGNTH

EMOM 15

1- 10 DB FLOOR PRESS

2- 10 DB RDL

3- 30 RUSSIAN TWISTS

WORKOUT

AMRAP 10

30 DOUBLE UNDERS (60 SU)

15 DUAL DB HANG CLEANS #50/35'S

julia
7 months 4 weeks ago

STRENGTH

SPLIT JERK WITH :02 PAUSE IN CATCH

5X3

BUILDING WORKOUT

3 RFT

500M ROW

15 SHOULDER TO OH #135/95

5 WALL WALKS

julia
8 months ago

SKILL

10 MINS TO ESTABLISH HEAVY 1 REP TURKISH GET UP

STRENGTH CONDITIONING

AMRAP 20

20 ALT HANG POWER SNATCHES #50/35

15 BURPEES OVER DB

10 TOES TO BAR